How should you properly install a stainless steel pipe making machine?
Most customers will be installed after receiving the machine. What are the installation steps of the stainless steel pipe making machine? Let's know some about it.
Step one: Transfer
When the equipment is being installed, be sure to use a forklift to move them to a suitable installation position.
Step two: Installation
Stainless steel pipe making machine needs to be fixed on the installation of the foundation, and do the relevant grounding treatment.
Step three: Add the Oil
Open the back cover of the stainless steel pipe making machine, and you can add hydraulic oil in the mailbox.
Step four: Connect the electricity
The power line of the stainless steel pipe making machine must ensure that all are connected to the power supply, click the motor to investigate the related direction of rotation, the direction of the motor rotation and the direction of the label connector on the motor should be consistent, or to let go of the power switch after connecting the wire, if the machine has action, then the opening of the whole mold should be increased, Only in this way can we ensure the consistency of the rotation direction of the motor. If the machine does not have any action, it is necessary to switch the two wires in front of the three wires back and forth.
Step five: Pressure adjustment
Stainless steel pipe making machine factory pressure is basically in 31.5 millipa, to rely on the first-class method to adjust, at the same time, such a machine pressure adjustment will gradually increase, counterclockwise direction pressure will gradually reduce, when the pressure has been adjusted, if you need to adjust the pressure of the easy flow valve, it is prohibited to use more than 31 millipa this equipment.